Data Center Commissioning Authority

We prove your facility works before your customers depend on it.

Third-party commissioning for mission-critical data centers and hyperscale facilities. We witness, document, and verify — from factory floor to Level 5 IST.

Full-Scope Commissioning,
No Conflicts of Interest

As an independent third-party Cx authority, we represent the owner's interests — not the contractor's schedule. Every deliverable is documented, every test is witnessed.

Levels 1–5 Commissioning

From factory witness testing through full integrated systems testing, we execute every commissioning level with your sequence of operations as the baseline — not a generic checklist.

View scope →

Electrical Commissioning

ATS timing verification, generator step-loading, UPS battery discharge, breaker coordination review, PDU/RPP point verification, and EPMS alarm walk. We close the loop on every transfer path.

View scope →

Mechanical Commissioning

Chiller plant staging and failover, pumping system balance, cooling tower performance, and airside FPTs. TAB report review plus spot verification. We find what the TAB contractor missed.

View scope →

Liquid Cooling / CDU Commissioning

Direct-to-chip loop verification, CDU functional performance testing, fluid quality sampling, differential pressure control validation, and leak detection system commissioning. Purpose-built for the AI compute era.

View scope →

BAS/Controls & EPMS Integration Testing

Point-to-point verification, trend log analysis, graphics walkdown, alarm rationalization, and network failover testing. Every control sequence is tested against what your SOO actually says.

View scope →

Retro-Commissioning & Ongoing Cx

Existing facility performance recovery, seasonal testing, and MOP/SOP procedure support. When your PUE is climbing and you don't know why, we find it.

View scope →

Why Third-Party Commissioning?

The GC wants to hand over the keys. The equipment vendors want to close out their punch lists. The MEP subs want to demobilize. None of them are responsible for whether your facility actually performs — after they're gone. That's what we do.

01

Unbiased Verification

No contractor relationship means no incentive to sign off on incomplete work. We pass when systems work and document when they don't.

02

Owner's Language

Every deliverable is written for the people who will operate and maintain this facility long after energization — not for the contractor's closeout package.

03

Field-First, Not Desk-First

We witness tests. We're in the data hall, at the switchgear, in the mechanical room. Not reviewing submittals from a desk three states away.

LIVE SYSTEM SNAPSHOT — SAMPLE READOUT
UTILITY INPUT 2,400 kW
SWITCHGEAR OUTPUT 2,388 kW
UPS OUTPUT 2,247 kW
IT LOAD 1,986 kW
CHWS SUPPLY 42.1°F
CHWR RETURN 54.8°F
PUE 1.35
All values verified against OPR acceptance criteria. Issue log: 0 open items.
Disabled Veteran-Owned Business
Independent — No GC Affiliation
Field-Witnessed Testing Only
Nationwide Project Reach
Documented Issue Log Closure

Your facility is a capital investment that has to perform on day one.

Tell us about your project. We\'ll review your timeline and scope, and respond within one business day with a scoping call or written proposal — not an automated quote.